Home / Guides / Spring Hill resurfacing cost
Guide
What resurfacing a Spring Hill pool costs
Published ballpark ranges, worked out for common backyard pool sizes. They're a starting point for budgeting, not a quote: your quote may differ, and a local contractor will price your pool on site for free.
Price per square foot, by finish
| Finish | Per sq ft | Per 1,000 sq ft |
|---|---|---|
| White plaster | $6–$8 | $6,000–$8,000 |
| Quartz | $7–$10 | $7,000–$10,000 |
| Pebble | $7–$15 | $7,000–$15,000 |
| Pebble Tec brand | $10–$20 | $10,000–$20,000 |
Source: HomeGuide pool resurfacing cost guide (2026); the Pebble Tec row is from HomeGuide's Pebble Tec pool cost guide. HomeGuide's overall range for most resurfacing jobs is $6,000–$15,000.
Worked out for common pool sizes
Contractors price the whole interior, walls included, not just the footprint. We approximate it as the floor plus the perimeter times an average depth of 4.5 feet. Steps, a sun shelf, benches or a spa add to it.
| Pool | Surface | Plaster | Quartz | Pebble |
|---|---|---|---|---|
| 10×20 | ≈ 470 sq ft | $2,800–$3,800 | $3,300–$4,700 | $3,300–$7,100 |
| 16×32 | ≈ 944 sq ft | $5,700–$7,600 | $6,600–$9,400 | $6,600–$14,200 |
| 20×40 | ≈ 1,340 sq ft | $8,000–$10,700 | $9,400–$13,400 | $9,400–$20,100 |
Calculated by us: each surface estimate multiplied by HomeGuide's low and high price per square foot, then rounded to hundreds. Other sizes: use the estimator.
An older Spring Hill pool: what else may show up
Spring Hill's median home was built in 1995, and about 28% of its homes date from the 1980s (U.S. Census Bureau, ACS 2024). On a pool that age, the quote often covers more than the finish:
- Tile line. New waterline tile: $1,200–$3,000 on a 10×20, $1,900–$4,800 on a 16×32, $2,400–$6,000 on a 20×40 (HomeGuide).
- Coping. $40–$80 per linear foot if the cap stones are loose or cracked (HomeGuide).
- Crack repair before the new coat. $100–$200 for small cracks, $700–$1,000 for large ones (HomeGuide).
- Bond beam crack. $4,000–$6,000 including resurfacing (HomeGuide).
Draining and refilling
- Draining. About $175–$225 (Bob Vila).
- Refill water. Roughly $55 for every 5,000 gallons (Bob Vila). Ask your water provider about rates.
How long a new finish lasts
Bob Vila's guide puts white plaster at around 10 years and quartz at around 12. Water balance and upkeep move those numbers a lot in either direction, so ask what the contractor's warranty covers.
Why two Spring Hill quotes can differ
- Size and shape. Depth, steps, benches and spas all add surface.
- Finish and color. Plaster is cheapest; pebble spans the widest range.
- Prep work. How many old layers come off and what gets repaired first.
- Tile and coping. Doing them now costs more today but avoids a second drain.
- Getting in. A screen enclosure, a narrow side yard or a fence can make it harder to bring equipment and hoses back, which affects labor.
We refer, we don't build: Spring Hill Pool Resurfacing hands your request to an independent licensed contractor, who may pay us for the referral.